Commercial Renovation
Do I Need a Permit for a Commercial Renovation in Ontario?
Do I need a permit for a commercial renovation in Ontario? What triggers one, why zoning comes first, and what unpermitted work actually costs you.
· 11 min read
Interior commercial renovation, partition walls, ceilings and finishes.
Photo by Deliberate Directions on Unsplash
Takes about 3 minutes
Free in-person consultation and estimate
We come to the property in person, look at the work and give you an estimate at no cost and no obligation.
Step 1 of 7 · Question 1 of 1
A real person responds within 24 hours.
This is the work itself, item by item. If your job does not need one of these, it is not on your estimate.
What the change of layout or use triggers under the Building Code, established first.
Approvals, work letters and building rules dealt with before work starts.
Drawings prepared and the permit filed and tracked through review.
Existing partitions, ceilings and finishes removed, with a designated substance survey first.
New walls built to the required fire and acoustic ratings, and ceilings installed.
HVAC, power, lighting and data altered by our trade partners and inspected.
Sprinkler and alarm devices relocated to suit the new layout, by our trade partners.
Flooring, paint, doors, hardware and joinery installed.
Scheduling around trading hours or neighbouring tenants where the building requires it.
Inspections carried to final, deficiencies closed and documents handed over.
Every job we take on follows the same sequence, from the first call to the walkthrough.
Size, current use, what is changing, and when you need to be operating.
Within 24 hours, to understand the lease, the building and the timeline.
We survey the space and the services, and quote the scope in writing.
Drawings prepared, landlord approval obtained, and the permit filed and tracked.
Strip-out, then partitions, mechanical, electrical and fire protection rough-in with inspections.
Ceilings, flooring, paint, doors and joinery completed.
Final approval, deficiency list closed, and the space handed over ready to use.
That is the whole job. Tell us about yours and we will price it — a real person calls you back within 24 hours.
Get a free estimateAny permits a project requires are arranged for that project and shown to you before work starts.
Based in Newmarket. Working across Toronto, York Region, Simcoe and Durham.
Office Renovation
We truly appreciate your commitment to this project. I must give a 100% satisfied mark as you not only finished the job early and under budget, but with great sub-contractors and excellent workmanship. The job was done very efficiently and timely.
Two minutes. A real person calls you back within 24 hours.
Commercial Renovation
Do I need a permit for a commercial renovation in Ontario? What triggers one, why zoning comes first, and what unpermitted work actually costs you.
· 11 min read
Photograph by MountainAsh on Unsplash
All guides