Skip to main content
Behfar Building

Separate Entrance Construction in Toronto & the GTA

Side and rear entrances for legal basement apartments, including excavation, stairs, drainage and permits.

A white mudroom with a built-in bench, coat hooks and a glazed side door onto a driveway

Photo by Douglas Sheppard on Unsplash

Get an estimate for your separate entrance construction

Takes about 3 minutes

Free in-person consultation and estimate

We come to the property in person, look at the work and give you an estimate at no cost and no obligation.

Step 1 of 7 · Question 1 of 1

What are you planning? (required)

A real person responds within 24 hours.

What’s included

This is the work itself, item by item. If your job does not need one of these, it is not on your estimate.

  • Zoning and Code review

    We check whether the entrance and the unit it serves are permitted on your lot.

  • Locates before digging

    Utility locates are requested through Ontario One Call before any excavation starts.

  • Excavation and shoring

    The stairwell excavated and supported, with the existing foundation protected.

  • Opening the foundation wall

    The wall cut and a lintel installed, with structural design by a qualified professional.

  • Stairwell construction

    Concrete or block walls, steps, landing and railings built to Code dimensions.

  • Drainage at the bottom

    A drain at the landing tied to a working outlet, so the stairwell does not become a well.

  • Door, frame and weatherproofing

    An exterior-rated door, properly flashed and sealed against the foundation.

  • Permits and inspections

    We prepare the application, book the inspections and hold the file to final approval.

How it runs

Every job we take on follows the same sequence, from the first call to the walkthrough.

  1. Tell us about the house

    Where the entrance would go, what is on that side of the house, and what the basement is for.

  2. We call you back

    Within 24 hours, with the zoning and setback questions that decide feasibility.

  3. Site visit and written estimate

    We check grade, services and the foundation wall, and quote the scope in writing.

  4. Drawings, engineering and permit

    Structural design for the opening, drawings, and the permit application filed and tracked.

  5. Locates and excavation

    Utility locates completed, then the stairwell excavated and the foundation supported.

  6. Opening, stairs and drainage

    The wall opened and lintelled, walls and steps built, drain installed and tested.

  7. Door, backfill and final inspection

    Door and railings installed, grading restored, and the inspections carried to final approval.

That is the whole job. Tell us about yours and we will price it — a real person calls you back within 24 hours.

Get a free estimate

Any permits a project requires are arranged for that project and shown to you before work starts.

Where we work

Based in Newmarket. Working across Toronto, York Region, Simcoe and Durham.

Tell us about your project

Two minutes. A real person calls you back within 24 hours.

Guides for separate entrance construction

Photograph by Point3D Commercial Imaging Ltd. on Unsplash

All guides
Call 647-394-5886