Skip to main content
Behfar Building

Heated Floors in Toronto & the GTA

Electric and hydronic in-floor heating.

Get an estimate for your heated floors

Takes about 2 minutes

Free in-person consultation and estimate

We come to the property in person, look at the work and give you an estimate at no cost and no obligation.

Step 1 of 7 · Question 1 of 1

Where do you want heated floors? (required)

A real person responds within 24 hours.

What’s included

This is the work itself, item by item. If your job does not need one of these, it is not on your estimate.

  • Floor assembly review

    We check the build-up, the height available and the finished floor before choosing a system.

  • Electric mat and cable

    In-floor heating mats and loose cable installed under tile and suitable finishes.

  • Hydronic tubing

    PEX tubing laid in slabs, plates or panels to a designed layout.

  • Insulation under the system

    Insulation below the heated layer so the heat goes up instead of into the ground.

  • Manifolds and zoning

    Manifolds, pumps and zone valves installed and labelled by room.

  • Heat source connection

    Boiler or water heater connection by our plumbing and gas partners.

  • Controls and sensors

    Floor sensors and thermostats installed and configured, wired by our electrical partner.

  • Pressure and continuity testing

    Tubing pressurised and cable resistance measured before and after the floor goes down.

  • Commissioning

    The system brought up slowly and each zone confirmed working.

How it runs

Every job we take on follows the same sequence, from the first call to the walkthrough.

  1. Tell us about the space

    Which rooms, the floor finish, and whether it is a renovation or new construction.

  2. We call you back

    Within 24 hours, to ask about floor height and the heat source.

  3. Site visit and written estimate

    We check the assembly and the controls, and quote in writing.

  4. System design

    Layout, zoning and controls designed for the rooms and the finish.

  5. Substrate and insulation

    Floor prepared and insulation installed below the heated layer.

  6. Tubing or cable installation and testing

    System laid out, tested, and documented before it is covered.

  7. Connection, commissioning and handover

    Heat source and controls connected, each zone tested, and operation demonstrated.

That is the whole job. Tell us about yours and we will price it — a real person calls you back within 24 hours.

Get a free estimate

Any permits a project requires are arranged for that project and shown to you before work starts.

Where we work

Based in Newmarket. Working across Toronto, York Region, Simcoe and Durham.

Tell us about your project

Two minutes. A real person calls you back within 24 hours.

Call 647-394-5886