Skip to main content
Behfar Building

Solar Panels in Toronto & the GTA

Rooftop solar design, installation and net metering.

Solar panels on a roof

Photo by Soren H on Unsplash

Get an estimate for your solar panels

Takes about 2 minutes

Free in-person consultation and estimate

We come to the property in person, look at the work and give you an estimate at no cost and no obligation.

Step 1 of 7 · Question 1 of 1

What are you considering? (required)

A real person responds within 24 hours.

What’s included

This is the work itself, item by item. If your job does not need one of these, it is not on your estimate.

  • Electrical partner

    All electrical work is performed by our electrical partner and inspected by the ESA.

  • Roof and shading assessment

    Orientation, shading and roof condition checked, because panels should not go on a roof near its end.

  • System design

    Array layout, inverter selection and production estimate prepared for your roof.

  • Structural review

    Roof structure assessed for the added load by a qualified professional where required.

  • Permits and utility application

    Building permit and the local distribution company's connection application filed and tracked.

  • Racking and flashing

    Mounting attached and flashed into the roof covering so the penetrations do not leak.

  • Panel and inverter installation

    Modules set and wired, and inverters mounted and connected.

  • ESA inspection and connection

    Inspection passed and the system connected under the utility's requirements.

  • Monitoring and handover

    Monitoring set up and the paperwork, including net metering documents, handed to you.

How it runs

Every job we take on follows the same sequence, from the first call to the walkthrough.

  1. Tell us about the property

    Roof type and age, orientation, and roughly what you spend on electricity.

  2. We call you back

    Within 24 hours, to check the roof and the service.

  3. Site visit and written estimate

    We assess roof, shading and panel capacity, and quote the scope in writing.

  4. Design, permits and utility application

    System designed, permit filed, and the connection application submitted.

  5. Racking and mounting

    Attachments installed and flashed, and racking set.

  6. Panels, inverter and inspection

    Modules and inverter installed and wired, then ESA inspection completed.

  7. Connection and handover

    System connected, monitoring configured, and the documentation handed over.

That is the whole job. Tell us about yours and we will price it — a real person calls you back within 24 hours.

Get a free estimate

Any permits a project requires are arranged for that project and shown to you before work starts.

Where we work

Based in Newmarket. Working across Toronto, York Region, Simcoe and Durham.

Tell us about your project

Two minutes. A real person calls you back within 24 hours.

Call 647-394-5886