Skip to main content
Behfar Building

Tiling in Toronto & the GTA

Floor, wall, backsplash and heated tile installation.

Get an estimate for your tiling

Takes about 2 minutes

Free in-person consultation and estimate

We come to the property in person, look at the work and give you an estimate at no cost and no obligation.

Step 1 of 7 · Question 1 of 1

What's being tiled? (required)

A real person responds within 24 hours.

What’s included

This is the work itself, item by item. If your job does not need one of these, it is not on your estimate.

  • Substrate preparation

    The surface flattened and made suitable, because tile telegraphs whatever is underneath.

  • Waterproofing in wet areas

    Bonded membrane in showers and on wet floors before tile is set.

  • Layout set out first

    Grid planned so cuts land sensibly and full tiles sit where the eye goes.

  • Uncoupling membrane

    Installed over slabs and heated floors where the assembly calls for it.

  • Floor, wall and backsplash tile

    Ceramic, porcelain, stone and glass set with the mortar and trowel the product needs.

  • Heated floor installation

    Electric mat or cable set in the assembly, with the connection made by our electrical partner.

  • Movement joints

    Soft joints at perimeters and changes of plane so the field can move without cracking.

  • Grout and sealing

    Grouted, cleaned and sealed where the material requires it.

  • Trim and edge detail

    Profiles, bullnose or mitred edges finished rather than left raw.

How it runs

Every job we take on follows the same sequence, from the first call to the walkthrough.

  1. Tell us what is being tiled

    Floor, shower, backsplash or all three, and roughly what area.

  2. We call you back

    Within 24 hours, to ask about the substrate and the waterproofing.

  3. Site visit and written estimate

    We check the surface, measure and quote the scope in writing.

  4. Tile selection and layout

    Tile chosen and the layout agreed with you before cutting starts.

  5. Preparation and waterproofing

    Substrate flattened, membrane installed and flood-tested where applicable.

  6. Setting the tile

    Tile set to the agreed layout, with joints and edges detailed.

  7. Grout, seal and walkthrough

    Grouted, cleaned, sealed, and the finished work walked with you.

That is the whole job. Tell us about yours and we will price it — a real person calls you back within 24 hours.

Get a free estimate

Any permits a project requires are arranged for that project and shown to you before work starts.

Where we work

Based in Newmarket. Working across Toronto, York Region, Simcoe and Durham.

Tell us about your project

Two minutes. A real person calls you back within 24 hours.

Recent tiling work

Before and after, with the real dimensions, durations and locations.

  • Modern living room with custom TV
    Original living
    BeforeAfter

    Whole Home Renovation

    Whole Home Renovation

    1,800 sq ft · 8 weeks · Richmond Hill, ON · Completed Mar 2025

All projects →
Call 647-394-5886